Operating width of approximately 47 feet with two 12-foot-wide travel lanes
6-foot-wide shoulders
External steel barrier rails meeting the latest safety requirements
6-foot-wide, separated pedestrian walkway on the west
Caltrans has selected Alternative 2B (East Alignment) as the preferred bridge replacement option. The plan calls for building a new bridge east of the current bridge. Once the new bridge is completed, the existing bridge will be removed.
The replacement bridge would be about 47 feet wide and include:
This alternative also includes road and intersection upgrades designed to improve driver and pedestrian safety, including:
Slide left to review new design
Click image to enlarge
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
You can find more information in our Cookie Policy and Privacy Policy.